Local no-audio video showing can conveying, lid placement, indexing positioning, seaming, and discharge process; description text only corresponds to these visible actions.
Local no-audio video showing can conveying, lid placement, indexing positioning, seaming, and discharge process; description text only corresponds to these visible actions.Multi-Station Rotary Can Seaming Line
01
Check Applicable Objects First
Metal cans and matching lids that can be stably positioned and seamed; can diameter, can height, seam, and lid components confirmed with actual samples
02
Packaging Materials and Process Must Match
Lids and seaming structure matching the can body; sealing compound, seam dimensions, and final sealing standard verified with samples; can feeding conveying, lid placement, rotary indexing positioning, seaming, optional inspection, and can discharge
03
Optional Modules Not Standard
Optional lid sorting and feeding, missing lid detection, lid orientation detection, seam inspection, abnormal rejection, buffering, and filling line interlocking.
Steps from Sample Confirmation to Delivery
Indexing positioning, lid fit, and seam quality require continuous verification
The more complete the samples, packaging materials, and site information, the easier it is to determine the equipment route, changeover scope, and line boundaries.
Inspect Can Lid SeamCheck can diameter, lid type, seam structure, sealing compound, and quality standards.
Verify Lid PlacementCheck lid incoming material, orientation, placement position, missing lid, and stability before entering the indexer.
Commission Indexing and Seaming TogetherVerify can feeding, lid placement, indexing positioning, seaming, discharge, and abnormal handling actions.
Continuous Acceptance Per StandardCheck seam, sealing, indexing stability, cycle time, interlocking, and changeover.
We only load non-essential third-party content and analytics services after obtaining your consent, to protect privacy and optimize browsing experience.