Automatic Die-Cut Lid Film Bottle and Jar Heat Sealer · Bottle/Jar Inline Die-Cut Sealing Operation Video
Local machine video showing conveying, inspection positioning, film roll die-cutting/pressing, and sealing result inspection of unmarked test bottles. Actual cycle time and stable sealing window to be confirmed per bottle mouth, film material, and project configuration.
Local machine video showing conveying, inspection positioning, film roll die-cutting/pressing, and sealing result inspection of unmarked test bottles. Actual cycle time and stable sealing window to be confirmed per bottle mouth, film material, and project configuration.Automatic Die-Cut Lid Film Bottle and Jar Heat Sealer
01
First check applicable objects
Plastic bottles, wide-mouth jars, and similar rigid containers with stable rims and repeatable positioning; irregular or soft-wall containers require sample evaluation
02
Packaging materials and process must match
Aluminum foil or composite lid film matching the container rim material; die-cutting and heat-sealing performance must be verified through actual samples; container conveying and positioning, lid film die-cutting, film pick-up and placement, heat sealing, discharge; inspection and rejection are optional modules
03
Optional modules are not standard
Optional infeed bottle handling, lid film inspection, sealing result inspection, reject removal, and downstream conveying; all must be confirmed separately.
Related solutions
Review the related packaging, sample and equipment-combination guidance.
Die-cutting, film pick-up, and rim positioning must be verified as a set of processes
Start with container photos, the intended lidding material and approximate output. You can enquire before drawings or full material specifications are ready; we will review the process and identify the samples needed.
Check bottle mouth and lid filmConfirm bottle mouth shape, diameter, material, lid film structure, and heat-seal layer.
Test die-cutting and film pick-upVerify die-cut edge, film release, pick-up stability, and film placement position.
Verify heat-seal windowUse post-filling samples to check the effects of temperature, pressure, time, and rim contamination.
Inline acceptanceAcceptance based on agreed cycle time, continuous operation, abnormal handling, and changeover scope.
We only load non-essential third-party content and analytics services after obtaining your consent, to protect privacy and optimize browsing experience.